18 18 18 18 18

產品名稱: 上海紫竹國際大廈

發布日期: 2019-01-23

點擊數: 290

詢價: 點擊產品詢價

二維碼:

簡述: 總建筑面積50218平方米,地下2層,地上22層,建筑總高度99.8米。總包單位:上海森信建設 Construction area is 50,218m2. Two storey basement and 22 storeys overground make the height 99.8m. General contractor: Shanghai Senxin Construction Engineering Co., Ltd.

產品詳情

上海紫竹國際大廈(原名浦東世紀花園三期辦公樓工程),位于上海市浦東新區芳甸路1108號,是一座高端商務的智能化辦公樓。總建筑面積50218平方米,地下2層,地上22層,建筑總高度99.8米。筏板基礎,主體為框架剪力墻結構。
Shanghai Park Center International building (formerly named Pudong Century Garden phase Ⅲ Office Building project) is located at NO.1108 Fangdian Road, Pudong new district of Shanghai. It’s an intelligent office building for high-end business, whose covered area is 50,218 m2, with 2 storey basement and 22 storeys overground, and overall height is 99.8m. This building is with raft foundation and frame shear wall structural main body.
總包單位:上海森信建設
General contractor: Shanghai Senxin Construction Engineering Co., Ltd
由我公司承擔勞務施工,承包模式;擴大勞務。
Our company did the labor construction package, in which our contract mode was labor supply and expanding services.
本工程先后榮獲上海市工程設計優秀獎、優質結構工程獎、安裝“申安杯”優質工程、“白玉蘭”杯及節約型工地等12種獎勵。
This project has won 12 awards including Excellence Award of Shanghai Municipal Engineering Designs, Engineering Award of High Structural Quality, High Installation Quality work of ShenAn Cup, BaiYuLan Cup and title of 'Resource-conserving Site'.

工程施工的重點、難點及技術措施
construction key points, difficulties and technical measures
(1)工程地處上海浦東新區,緊鄰上海國際博覽中心和世紀公園,施工場地狹窄,環保要求高。
Project site is located in Shanghai Pudong new district, next to Shanghai International Expo Center and Century Park. Space of the construction plant is small, while the environmental requirement is quite high.
(2)基坑開挖深度達9.5米, 局部挖深11.85米,基坑面積大,地下室外墻距磁懸浮電纜約18.8米,并與周邊地鐵站出入口相通,基坑監護要求高是本工程的一大難點。
Excavation depth of foundation pit is 9.5m; depth of certain part even reaches 11.85m. Area of foundation pit is huge. Basement exterior wall is 18.8m from maglev cable and is interlinked with surrounding metro station entrances. All these elements require a demanding pit guardianship, which is one of the difficulties in this project.
(3)工程基坑面積達1.1萬平方米,周長約433米,底板厚1.5米,混凝土澆筑量近1萬立方米,防止大體積混凝土底板產生溫度裂縫是本工程的又一項難點。
Area of the foundation pit reaches 11,000 m2, perimeter is about 433m, floor thickness is 1.5m and amount of poured concrete is around 10,000 m3. Therefore, to avoid cracking due to change of temperature of mass concrete floor becomes another difficulty in this project.
(4)地下水位高,涉水部位多,防水工程復雜。地下室頂板設置了景觀水池和廣場集水坑,防滲漏要求高。
High underground water level and many wading places make the waterproof work complex. Drain pit for landscape pool and square is set on basement roof, which asks for a high leakproofness quality.

主體結構工程,嚴格過程控制,鋼筋采用電腦排版,定尺進料,模板、混凝土等分項工程,層層把關,主體框架內實外美,節點方正,垂直度、平整度最大偏差6mm,達到清水混凝土水平。
Major structure work is strictly process controlled. Reinforcement bars are computer typeset. Each sub divisional work such as feeding, formwork, concrete is carefully examined and implemented. These work enable main body frame to be solid and nice-looking. Maximum deviation of the verticality and flatness is 6mm, which reached the level of fair-faced concrete

上一個:上海帝豪大廈

下一個:常州工地

產品詳細

18 18 18 18 18

產品名稱: 上海紫竹國際大廈

發布日期: 2019-01-23

點擊數: 291

詢價: 點擊產品詢價

二維碼:

簡述: 總建筑面積50218平方米,地下2層,地上22層,建筑總高度99.8米。總包單位:上海森信建設 Construction area is 50,218m2. Two storey basement and 22 storeys overground make the height 99.8m. General contractor: Shanghai Senxin Construction Engineering Co., Ltd.

產品詳情

上海紫竹國際大廈(原名浦東世紀花園三期辦公樓工程),位于上海市浦東新區芳甸路1108號,是一座高端商務的智能化辦公樓。總建筑面積50218平方米,地下2層,地上22層,建筑總高度99.8米。筏板基礎,主體為框架剪力墻結構。
Shanghai Park Center International building (formerly named Pudong Century Garden phase Ⅲ Office Building project) is located at NO.1108 Fangdian Road, Pudong new district of Shanghai. It’s an intelligent office building for high-end business, whose covered area is 50,218 m2, with 2 storey basement and 22 storeys overground, and overall height is 99.8m. This building is with raft foundation and frame shear wall structural main body.
總包單位:上海森信建設
General contractor: Shanghai Senxin Construction Engineering Co., Ltd
由我公司承擔勞務施工,承包模式;擴大勞務。
Our company did the labor construction package, in which our contract mode was labor supply and expanding services.
本工程先后榮獲上海市工程設計優秀獎、優質結構工程獎、安裝“申安杯”優質工程、“白玉蘭”杯及節約型工地等12種獎勵。
This project has won 12 awards including Excellence Award of Shanghai Municipal Engineering Designs, Engineering Award of High Structural Quality, High Installation Quality work of ShenAn Cup, BaiYuLan Cup and title of 'Resource-conserving Site'.

工程施工的重點、難點及技術措施
construction key points, difficulties and technical measures
(1)工程地處上海浦東新區,緊鄰上海國際博覽中心和世紀公園,施工場地狹窄,環保要求高。
Project site is located in Shanghai Pudong new district, next to Shanghai International Expo Center and Century Park. Space of the construction plant is small, while the environmental requirement is quite high.
(2)基坑開挖深度達9.5米, 局部挖深11.85米,基坑面積大,地下室外墻距磁懸浮電纜約18.8米,并與周邊地鐵站出入口相通,基坑監護要求高是本工程的一大難點。
Excavation depth of foundation pit is 9.5m; depth of certain part even reaches 11.85m. Area of foundation pit is huge. Basement exterior wall is 18.8m from maglev cable and is interlinked with surrounding metro station entrances. All these elements require a demanding pit guardianship, which is one of the difficulties in this project.
(3)工程基坑面積達1.1萬平方米,周長約433米,底板厚1.5米,混凝土澆筑量近1萬立方米,防止大體積混凝土底板產生溫度裂縫是本工程的又一項難點。
Area of the foundation pit reaches 11,000 m2, perimeter is about 433m, floor thickness is 1.5m and amount of poured concrete is around 10,000 m3. Therefore, to avoid cracking due to change of temperature of mass concrete floor becomes another difficulty in this project.
(4)地下水位高,涉水部位多,防水工程復雜。地下室頂板設置了景觀水池和廣場集水坑,防滲漏要求高。
High underground water level and many wading places make the waterproof work complex. Drain pit for landscape pool and square is set on basement roof, which asks for a high leakproofness quality.

主體結構工程,嚴格過程控制,鋼筋采用電腦排版,定尺進料,模板、混凝土等分項工程,層層把關,主體框架內實外美,節點方正,垂直度、平整度最大偏差6mm,達到清水混凝土水平。
Major structure work is strictly process controlled. Reinforcement bars are computer typeset. Each sub divisional work such as feeding, formwork, concrete is carefully examined and implemented. These work enable main body frame to be solid and nice-looking. Maximum deviation of the verticality and flatness is 6mm, which reached the level of fair-faced concrete

上一個:上海帝豪大廈

下一個:常州工地

產品詳細

18 18 18 18 18

產品名稱: 上海紫竹國際大廈

發布日期: 2019-01-23

點擊數: 292

詢價: 點擊產品詢價

二維碼:

簡述: 總建筑面積50218平方米,地下2層,地上22層,建筑總高度99.8米。總包單位:上海森信建設 Construction area is 50,218m2. Two storey basement and 22 storeys overground make the height 99.8m. General contractor: Shanghai Senxin Construction Engineering Co., Ltd.

產品詳情

上海紫竹國際大廈(原名浦東世紀花園三期辦公樓工程),位于上海市浦東新區芳甸路1108號,是一座高端商務的智能化辦公樓。總建筑面積50218平方米,地下2層,地上22層,建筑總高度99.8米。筏板基礎,主體為框架剪力墻結構。
Shanghai Park Center International building (formerly named Pudong Century Garden phase Ⅲ Office Building project) is located at NO.1108 Fangdian Road, Pudong new district of Shanghai. It’s an intelligent office building for high-end business, whose covered area is 50,218 m2, with 2 storey basement and 22 storeys overground, and overall height is 99.8m. This building is with raft foundation and frame shear wall structural main body.
總包單位:上海森信建設
General contractor: Shanghai Senxin Construction Engineering Co., Ltd
由我公司承擔勞務施工,承包模式;擴大勞務。
Our company did the labor construction package, in which our contract mode was labor supply and expanding services.
本工程先后榮獲上海市工程設計優秀獎、優質結構工程獎、安裝“申安杯”優質工程、“白玉蘭”杯及節約型工地等12種獎勵。
This project has won 12 awards including Excellence Award of Shanghai Municipal Engineering Designs, Engineering Award of High Structural Quality, High Installation Quality work of ShenAn Cup, BaiYuLan Cup and title of 'Resource-conserving Site'.

工程施工的重點、難點及技術措施
construction key points, difficulties and technical measures
(1)工程地處上海浦東新區,緊鄰上海國際博覽中心和世紀公園,施工場地狹窄,環保要求高。
Project site is located in Shanghai Pudong new district, next to Shanghai International Expo Center and Century Park. Space of the construction plant is small, while the environmental requirement is quite high.
(2)基坑開挖深度達9.5米, 局部挖深11.85米,基坑面積大,地下室外墻距磁懸浮電纜約18.8米,并與周邊地鐵站出入口相通,基坑監護要求高是本工程的一大難點。
Excavation depth of foundation pit is 9.5m; depth of certain part even reaches 11.85m. Area of foundation pit is huge. Basement exterior wall is 18.8m from maglev cable and is interlinked with surrounding metro station entrances. All these elements require a demanding pit guardianship, which is one of the difficulties in this project.
(3)工程基坑面積達1.1萬平方米,周長約433米,底板厚1.5米,混凝土澆筑量近1萬立方米,防止大體積混凝土底板產生溫度裂縫是本工程的又一項難點。
Area of the foundation pit reaches 11,000 m2, perimeter is about 433m, floor thickness is 1.5m and amount of poured concrete is around 10,000 m3. Therefore, to avoid cracking due to change of temperature of mass concrete floor becomes another difficulty in this project.
(4)地下水位高,涉水部位多,防水工程復雜。地下室頂板設置了景觀水池和廣場集水坑,防滲漏要求高。
High underground water level and many wading places make the waterproof work complex. Drain pit for landscape pool and square is set on basement roof, which asks for a high leakproofness quality.

主體結構工程,嚴格過程控制,鋼筋采用電腦排版,定尺進料,模板、混凝土等分項工程,層層把關,主體框架內實外美,節點方正,垂直度、平整度最大偏差6mm,達到清水混凝土水平。
Major structure work is strictly process controlled. Reinforcement bars are computer typeset. Each sub divisional work such as feeding, formwork, concrete is carefully examined and implemented. These work enable main body frame to be solid and nice-looking. Maximum deviation of the verticality and flatness is 6mm, which reached the level of fair-faced concrete

上一個:上海帝豪大廈

下一個:常州工地

單頁簡介
江蘇宏萬里建筑勞務有限公司
總公司辦:南京市中山東路288號3006室
蘇州昆山辦:蘇州昆山市衡山路799號19#2303室
總機:0512-36885556
傳真:0512-36882869
郵箱:[email protected]
網址:www.rvejxx.live
新聞類別

CopyRight© 2019 江蘇宏萬里建筑勞務有限公司  蘇ICP備14018347號  技術支持:仕德偉科技

网球比分即时 代还信用卡赚钱不 手机店搞活动怎么赚钱 赚钱400 fifa14手机经理模式赚钱 艾美国际赚钱方式 赚钱文案如何发朋友圈 老师赚钱目标 差旅费什么最赚钱 霸屏天下app真的能赚钱吗 阅读短视频点赞赚钱 在广东有人养竹鼠赚钱 赚钱棋牌游戏可提现金 喀斯玛商城商家赚钱吗 推广直播类软件赚钱 有没有不用登录赚钱的好方法 澳洲兼职赚钱